Scheduled (Document Processing Timeframe)

This is a code value from the Document Processing Timeframe code class.

Descriptions

English Short Description Scheduled
English Long Description The order item is scheduled for a future date. On the scheduled date this order item will be processed as soon as possible through a processing queue.
French Short Description !!SCHEDULED
French Long Description !!THE ORDER ITEM IS SCHEDULED FOR A FUTURE DATE. ON THE SCHEDULED DATE THIS ORDER ITEM WILL BE PROCESSED AS SOON AS POSSIBLE THROUGH A PROCESSING QUEUE.
Sequence Number

Effective Period

Can be used during any time period.

    No links found.

Database Mapping

Code Value ID: 100720